The concept behind the project is driven by the two distinct character areas of the site defined by the original villa at the front and contemporary classroom block at the rear. Observing a close hierarchy between the striking existing old building and the open and attractive nature of the suburban site provides a strong narrative to our design work.

Andrew Hoare

Sherborne House School, Eastleigh

800 sqm £3m Eastleigh

We were commissioned by Sherborne House School and GEMS education to develop concept designs for the regeneration of the school campus, exploring how the existing campus can be enhanced and refreshed to provide improved teaching facilities. Our work tested a number of assumptions for the future development of the school. We took a masterplan approach to ensure the site assets developed along a coherent manner and had a broad base to meet the schools needs both in the short and long term.

The proposals are to develop a new six classroom block replacing the original buildings, and to develop a new multi-use dining hall. The design concept is driven by the two distinct character areas on the site defined by the original villa at the front and contemporary classroom block at the rear. Observing a close hierarchy between the striking existing building and the open and attractive nature of the suburban site provides a strong narrative to our design. Early design concepts in sketch form drew out the architectural language for the two distinct character areas within the campus.

The Team
Tell us about your project

Now you know us, tell us about you

We’d love to know some more about you and your project, so get in touch and we’ll get the ball rolling. Or alternatively give us a call.

We needs the contact information you provide to us to contact you about our products and services. For information about our privacy practices and commitment to protecting your privacy, please review our Privacy Policy.